Subscribe to the
FedTech E-Newsletter



Visit the 21st Century Government

SUBSCRIBE

Get what you need to know about information technology solutions to improve your agency.
subscribe now »

» comment  del.icio.us
» print  digg this
» email  reddit
 rss feeds

RELATED MOST POPULAR

Maximizing VMware's Value
Here are five tips to build a virtual environment that will become the platform for all your IT projects.
Creating a Virtual Test Lab
Using virtualization software in a test lab provides an excellent way to avoid disruptions to users during an IT project.
Beat the Heat
These tips can help effectively and efficiently cool high-density computing environments.
Brief Byte
Where do agencies expect to reap cost savings by reducing footprint?
Data on Tap
In federal IT shops, when it comes to unlimited access, the idea really keys in on data: how feds can tap it, use it, store it — from any device and from anywhere in the world.
The Many Faces of Cloud
DISA, NASA and other early adopters are cutting costs and improving IT services through the cloud.
InfiniBand in the Enterprise Data Center
InfiniBand: The high-speed switching fabric makes its way into the enterprise data center.
Desktop Power Management
Try these four tactics for reducing PC energy consumption.
Network Monitoring: Ipswitch WhatsUp Gold
Ipswitch WhatsUp Gold monitors the network and alerts you to problems.
Compellent Storage Center SAN
Compellent provides a modular approach to virtualized storage — a SAN that scales as fast or slow as you need it to.
[  What's New  ]

Pump Up the Power
When you need to add CPUs to a server, do your homework so the process doesn't bring your system to a grinding halt.
By Justin James
1/14/2010


For better or for worse, an organization does not always order servers with all of the CPU power needed — because of budget, because of a change in use, because a server needs to last longer than first expected. And now, with the growing use of virtualization and ever increasing application workloads, servers often must shoulder loads much larger than what they were originally designed to handle.

As a result, it is a common task to have to add an additional CPU (or upgrade the existing CPUs) months or even years after a server was purchased. Here are some tips to make that upgrade a smooth process.

Tip 1: Try your original source first.

Often your best bet is to call up the vendor from whom you bought the original server to order the additional or upgraded CPUs. Sometimes you might pay a bit more than “street price” for the CPUs, but you get peace of mind with your purchase if it’s an original equipment manufacturer product.

The original vendor will have pre-tested the CPUs with your hardware combination, ensured that they are all from revisions or batches that will work well together, and so on. Caveat: Be sure to order the correct heat sink if the CPU does not come with one.

Tip 2: Buy the right CPU.

If your server was a “white box” or self-assembled model, prepare to do some research. If you are replacing the existing processors, go to the motherboard manufacturer’s website to get a list of compatible CPUs. If you are ordering more than one processor, order them at the same time from a single vendor. It’s also wise to order from a vendor that lets you work with a sales associate, so that you can make it clear that the processors need to be the same revision and from the same batch if possible.

If you are adding additional processors, you need to be particularly careful on this score. It is critical to match the new processors to the existing CPUs, or else you could experience system instability.

In addition to the CPU, you need to check with your chassis manufacturer if the stock heat sinks that come with the CPU will fit in the case, or if you will need to order special heat sinks.

Tip 3: If virtual machines reside on the server, do a little additional research.

If the server hosts VMs, you will need to talk to the maker of the virtualization software before upgrading or adding CPUs. Be sure to find out what effect, if any, upgrading the CPUs might have on VM performance.

Generally, a virtualization environment should not be a problem, but it is better to find out about potential hiccups in advance rather than the first time you fire up the server after the upgrade.

Tip 4: Prepare ahead for the installation.

Installing a CPU is a pretty easy task, but you must be cautious all the same. You will want to review the instructions and look for any gotchas. The stock heat sink already has just the right amount of thermal grease on it, so you do not need to worry about that. When you add the paste on yourself, you are likely to put on too much or too little, which can cause overheating.

One of the truths in IT is that every simple, five-minute task always takes much longer. All sorts of things can go wrong, such as having a hard time mounting the fan or finding a weird error on system post.

Make sure that you allocate enough time to resolve any problems (give yourself at least 30 minutes), and keep any removed parts handy in case you need to put them back in to get the server up again in its original configuration.

Finally, be sure to make a full backup of the system or clone the drive, so that if the operating system has a problem adapting to the new CPUs (particularly in the case of an upgrade) that you can revert the OS to its original state.

 

 

Justin James handles network engineering, systems administration and software development as an employee for Levit & James, a document conversion company in Leesburg, Va.

 

 

 